Digital Front Desk Try it free

Free templates · Industrial sites

Free template · no sign-up

Fire evacuation roll-call sheet

A fire evacuation roll call sheet for each muster point, with a section for the contractors and visitors on the sign-in list.

For Plants and warehouses, at the assembly point

First page of the fire evacuation roll-call sheet

What it is for

In the United States, where an OSHA standard requires an emergency action plan, OSHA's emergency action plan rule lists among the minimum elements of that plan:

"Procedures to account for all employees after evacuation;" OSHA 29 CFR 1910.38(c)(4), osha.gov

This sheet is a tool for carrying out that kind of procedure at a muster point. It supports your site's emergency action plan; it does not replace it, and it does not decide who should be on the list. In Canada, check your province's requirements for emergency procedures.

Who it is for

Fire and floor wardens, shift supervisors and the safety lead at a single-site plant or warehouse.

How to use it

Fill in the names before a drill, then the warden at each muster point marks every person accounted for, yes or no.

  1. Before a drill, fill in the names each muster point should account for, from your staff and shift lists.
  2. At the muster point, the warden marks each person accounted for, yes or no, with notes (for example "seen leaving by the north exit").
  3. Bring the current contractor and visitor sign-in sheet, and account for everyone on it who has not signed out.
  4. Record the time all names were accounted for, and report anyone missing to the incident lead and emergency services.

What is roll call in a fire evacuation?

Roll call is the check, at the assembly point, that every person who should have left the building has been seen outside. A warden reads down a list of names and marks each one accounted for, so anyone missing can be reported to the fire department quickly instead of guessed at. The Canadian Centre for Occupational Health and Safety, a federal agency whose guidance is advice rather than law, lists it among the musts of an emergency plan:

"Specify safe locations for staff to gather for head counts to ensure that everyone has left the danger zone." CCOHS, Emergency Planning, ccohs.ca

In Ontario, the Fire Code requires a fire safety plan in the buildings it applies to, and that plan must provide for evacuating occupants and for fire drills (O. Reg. 213/07, Division B, Article 2.8.2.1). It does not mention a roll call by name; how your site accounts for people is something your own plan and your fire department settle. Other provinces have their own fire codes. This is not legal advice.

A roll call is only as good as its list. Staff come from your shift lists; contractors and visitors come from the sign-in sheet, which is why the sheet goes to the muster point with the warden.

Printable preview

Evacuation roll call Date: ________ Time of alarm: ________

Muster point: ____________________ Warden name: ____________________

Name to account forAccounted (yes / no)Notes

Contractors and visitors from the sign-in list

NameCompany or organizationHostAccounted (yes / no)Notes

Time all accounted for: __________ Warden signature: ______________________

Moving off paper? See how the Digital Front Desk visitor management system signs visitors in on your own tablet, with its prices in Canadian dollars.

More templates for industrial sites

All 8 free templates
First page of the contractor sign-in sheet

Contractor sign-in sheet

A sign-in sheet for contractors arriving at a plant or warehouse.

First page of the industrial visitor log

Industrial visitor log

A visitor log for a single-site plant or warehouse.

First page of the contractor orientation checklist

Contractor orientation checklist

A checklist for the site orientation a contractor gets before starting work.

The Digital Front Desk check-in screen on a tablet, welcoming a visitor to Northside Family Clinic, with a Start check-in button